    Natural Gas Pipelines
Capabilites
- Front end development 
- Detailed engineering 
- Construction management 
- Materials sourcing 
- Pipe diameters up to 42” 
- Muskeg, Peat and Permafrost design considerations 
- Crossing designs for waterways and roads 
- NEB application and submission 
- Regulatory for BC, AB, SK, MB and ONT 
- 3D design 
- Process engineering 
- High operating temperatures and pressures 
- Construction inspection services including mechanical and environmental 
- Riser & ESD stations 
- Slope stability and erosion mitigation 
- Hydraulic and stress modeling 
Previous Projects
- 
      
      
      
        
  
       Loop Sleeves Installation on 42" MainlineThis project involved stress analysis to facilitate the installation of sleeve assemblies on a 42” line while in operation. Project details: - Comprehensive non-linear stress analysis on two sleeve assemblies to be installed on an NPS 42 mainline to repair expanded 42” pipe girth welds at two locations 
- Stress analysis and evaluations conducted as per ASME Section VIII Div 2, Section 5.2.4 Elastic Plastic Analysis method 
 
- 
      
      
      
        
  
      Mainline Loop Receiver and Bypass Stress AnalysisLanmark was engaged by a client to perform stress analysis for a mainline piping bypass. Project details: - Design and CSA Z662 stress analysis for NPS 42 permanent bypass piping with valve and permanent receiver barrel assembly, tie-ins, and piping support loads 
- Design pressure: 8,690 kPag 
- Content: Sales Gas 
- Flange leakage check per ASME BPV section VIII Div 1 and Div 2 
 